Dispo Wise Main Plan Entry Form
Search Dispo Number
No dispo numbers available
Clear Form
Save Record
Update Record
Export to Excel
Delete Record
Back
PO Issue Date
PO Received Date
PP Sample Delivery Date
Bulk Fabric Delivery Date
PO Revised Date
Bulk Revised No.
Bulk Revised Reason
Reproduction Revised No.
Reproduction Revised Reason
PO No.
PI Unit/LC Unit
Order No
Account Holder
Buyer
Garments Name
Customer Ref/Stl
Buyer Color Reference
Weave
Finish Type
Marketing Reff/Tracking No
Desk Loom/Strike Off No
End Use
Order Type
Select Type
Bulk
Sample
Re-order
Yarn Type
Fabric Type
Process Type
Print Method
Dispo No.
Sticker Construction
Production Construction
Sticker Composition
Fabric Composition
Finish EPI
Finish PPI
Grey EPI
Grey PPI
PO Quantity (Yds)
Dispo Quantity (Yds)
Adjust Quantity (Yds)
Finishing Process Loss
Printing Allowance
Loom Construction
Lower Beam/Regular Crimp
Upper Beam/Seer Sucker Crimp
Left Selvedge (Name)
Left Selvedge (Specification)
Right Selvedge (Name)
Right Selvedge (Specification)
Total Ends of Body
Required Print Production (Meter)
Required Greige Production (Meter)
Required Loom Production (Meter)
Required Warp Length (Meter)
Finish Width (Inch)
Cuttable Width (Inch)
Grey Width (Inch)
Total Ends
No. of section in Lower Beam
Creel Repeat Of Lower Beam
Reed Count
Ends Per Dent
Reed Width (Inch)
Flange To Flange
Warp Cover Factor
Weft Cover Factor
Total Cover Factor
Reed Space
Total Ends Of Lower Beam
Warping Length of Upper Beam
Total Ends of Upper Beam
No. of section in Upper Beam
Creel Repeat of Upper Beam
Crimp Percent of Upper Beam
Warp Yarn Dyeing Allowance
Weft Yarn Dyeing Allowance
Warp Consumption
Weft Consumption
Total Consumption
RPM
Eff
Yarn Dyeing Lead Time
Dyed yarn Advance Days for inhouse
Total Greige Lot
Finishing Lead Time
Final Loom Production Date
Loom Start Date
Start up days
Per day run loom in Startup